Architectural drawings
Geo-technical Engineer report
Soil conditions
Structural and blueprint drawings
Site plan
Direction of house (show north)
Elevations
Floor plan
Septic field or sewer location
Approval of drawings by city or region
Excavation of site
Geo-technical Inspection
Forms for foundation or pad
Inspection foundation
Pouring of concrete for foundation or pad
Radiant heat?
Floor built on foundation
Dome assembly and erection
Remove areas for doors and windows and add framing
Second floor and stairs
Window and door framing with dormers
Optional depending on type of Insulation
Strapping for addition roof cap 2 1/2 inches
Add additional roof cap
Remember venting
Continue
Building paper product over house / envelope seal
Structural and envelope inspection
Strapping or extruded plastic for walls (rainscreen) 10 mm for outside walls
Install outside doors and windows
Outside wall covering stucco, wall shakes
Roofing shingles 8 inch overlap over shingles
Torch-on at cap 8 inch overlap over shingles
Lock up complete
Phase Two
Plumbing rough in
Electrical rough in
Heating and air conditioning rough in
Electrical inspection
Plumbing inspection
Insulation
Vapour barrier (if required)
Structural and envelope inspection
Drywall, stucco or other inside wall covering
Painting, wall paper, texturing
Complete electrical and Plumbing installations
Flooring
Finish carpentry
Interior doors and trim (baseboards, etc.)
Stair railings and finish
Landscaping
Occupancy permit with final inspection